Demolition
Demolition Debris Containers in Hartford
Porches, decks, sheds, garages and interior gut-outs, plus the paperwork that catches people out. Hartford sets a sixty-day public notice period before a demolition permit application, and notification is required asbestos or not.
Most demolition in Hartford is partial rather than total. A rear porch or stair tower that has rotted from the treads down on a three-decker or a Perfect Six. A detached garage behind a terrace that has been leaning for a decade. A shed, a deck, a chimney above the roofline, or a flat gutted to the studs so it can be rebuilt. All of those produce dense, mixed, awkward debris: framing, decking, lath and plaster, roofing, brick, old flooring and whatever was nailed to the back of it. It loads slowly, it fills a container unevenly, and the honest way to plan it is by weight rather than by the size of the structure coming down.
The paperwork is where Hartford differs from the assumption most people arrive with. The city's Municipal Code, at section 9-14(b), sets a sixty-day public notice period before a demolition permit application, which is a long time if nobody told you about it at the start of the project. On top of that, Connecticut requires a demolition notification for any structure being demolished, whether or not asbestos is present. That is not the federal position, and it is not the position in the states around us. Build both into the programme before the first fastener comes out rather than discovering them a fortnight before the crew is due.
Asbestos is the third piece and Connecticut handles it in a way worth reading twice. RCSA section 19a-332a-1 defines a facility to include residential property including single family homes, so there is no owner-occupied carve-out here at all. Abatement notification and licensing sit with the Department of Public Health on ten days' notice. CT DEEP issues the $300 Special Waste and Asbestos Disposal Authorization. The Department of Administrative Services Office of the State Fire Marshal licenses demolition contractors. Asbestos-containing material is expressly excluded from the statutory definition of C and D waste, which means it cannot ride in a container, ever. On Hartford's pre-1940 stock, siding shingles and pipe insulation are the usual places it turns up.
Demolition Work A Container Serves
Rear Porches And Stair Towers
The single most common demolition job in this city. Three storeys of framing, decking, balusters and rotted stringers off the back of a multifamily, usually with a rebuild following straight behind it.
Detached Garages
Behind the terraces and off the alleys. Framing, roofing, a concrete slab that is a separate material and a separate box, and often a floor of stored material nobody mentioned.
Sheds And Outbuildings
Timber, felt, sheet metal and a base. Quick to bring down and deceptively heavy once the roofing and the base are in the load together.
Interior Gut-Outs
A flat stripped to the studs. Plaster and lath from pre-1950 walls is dense, dusty and heavy, and it is the material that decides the box size for the whole job.
Decks And Ramps
Framing, decking, rails and post bases. If the posts are set in concrete below the 42 inch frost line, that is a dig, and a dig means Call Before You Dig first.
Chimneys Above The Roofline
Brick, mortar and flashing. The brick is a weight material that wants a small box loaded flat, and the flashing is scrap metal that comes out of the load entirely.
Fire And Storm Damaged Structures
Partial collapse, wind damage and burnt fabric. Handled carefully, sorted where it can be, with anything of a hazardous character routed to the MDC facility rather than the container.
Fencing, Walls And Hardstanding
Timber and chain-link fencing, retaining walls, paths and driveway slabs. Masonry goes into its own container loaded flat and low, not on top of a pile of timber.
Sizing A Demolition Container
Demolition sizing is decided by the densest material in the load. A 20 yard is the right box for a porch, a deck, a shed or a single-room gut-out, and it takes plaster and lath without going overweight. A 30 yard suits a garage, a whole-flat gut or a substantial structure coming down over a week or two, and it is the size most demolition jobs in Hartford settle on. A 40 yard is only for light bulky material — framing, cabinetry, siding, roofing timber — and it must never take masonry, plaster or wet material, because the extra height makes it easy to load past a legal payload while the container still looks half full. Where the structure has both, the sensible arrangement is a 30 for the mixed debris and a 10 alongside it for the brick, block and concrete. Slab and footing spoil is a separate job again and belongs in a heavy-debris box loaded flat.
20 Yard Dumpster
A full basement and attic clear-out — the New England default — or a multi-room remodel.
View this size →30yd³30 Yard Dumpster
A whole Perfect Six or three-decker with basement and attic, or a large remodel.
View this size →40yd³40 Yard Dumpster
Bulky light debris only: porch framing, fencing, siding, insulation, fit-outs.
View this size →Notification, Digging And Placement
Three things go in front of the first fastener. Notification: Connecticut requires a demolition notification for any structure being demolished, asbestos present or not, and Hartford's own Municipal Code at section 9-14(b) sets a sixty-day public notice period before a demolition permit application. Asbestos: DPH takes abatement notification on ten days' notice and does the licensing, CT DEEP issues the $300 Special Waste and Asbestos Disposal Authorization, and the DAS Office of the State Fire Marshal licenses demolition contractors. RCSA section 19a-332a-1 expressly covers single family homes. Digging: anything breaking ground — post bases below the 42 inch frost line, a slab, a stump, a buried tank — needs Call Before You Dig under CGS section 16-345 and following. On placement, IFC 2021 section 304.3.3 keeps a container of 1.5 cubic yards or more five feet clear of combustible walls, openings and eave lines, which on a porch demolition is exactly the wall you are working against. In the street it is an Obstruction Permit at $50 plus three cents per square foot per day, on 860-757-9970.
Not sure this is the right service? Describe the job on the phone and we will point you at the right container even if it is a different service page. Call (959) 666-6427.
Get a flat quote
Two minutes on the phone gets you a size, a price and a delivery slot. No forms.
(959) 666-6427Recommended sizes
How it works
Demolition Debris Removal in four steps
- 1
Call us
Tell us the project, your address and when you want it. Two minutes on the phone and you have a flat price.
- 2
We deliver
Our driver walks the drop, lays protection boards and sets the container exactly where you want it.
- 3
You load it
Take your time within your rental window. Keep it level with the top rail and we handle the rest.
- 4
We haul it
Call or text when you are done. We pull it, sort what can be recovered and dispose of the rest properly.
Demolition Debris Removal FAQs
Do I need a permit to take down a porch or a garage?
Assume yes and start early, because Hartford's timeline is longer than most. The city's Municipal Code at section 9-14(b) sets a sixty-day public notice period before a demolition permit application, so this is a project you plan around rather than fit in at the end. Separately, Connecticut requires a demolition notification for any structure demolished whether or not asbestos is present, which is not the federal position and catches out contractors who work across state lines. We can put a container on site whenever you want it, but we are not the permitting authority and we would rather tell you the timeline honestly than let you find it out late.
What happens if there is asbestos in the structure?
The demolition stops being a demolition job until it is dealt with. Connecticut's arrangement is a three-way split: the Department of Public Health handles abatement notification, with ten days' notice, and licensing; CT DEEP issues the $300 Special Waste and Asbestos Disposal Authorization; and the DAS Office of the State Fire Marshal licenses demolition contractors. RCSA section 19a-332a-1 defines a facility to include residential property including single family homes, so the owner-occupied exemption people expect from the federal rule does not exist here. Asbestos is expressly excluded from the statutory definition of C and D waste, which means it cannot go in a container at all. On pre-1940 Hartford stock, look at siding shingles and pipe insulation first.
Can demolition debris go in one mixed container?
Yes, and that is what the state recommends. CT DEEP's guidance on renovation waste says the easiest and most common way to manage construction waste is to commingle most waste into one roll-off that the hauler takes to a materials recovery facility or transfer station. The mandatory separations are corrugated cardboard and scrap metal, both designated mandatory recyclables under CGS section 22a-241b, which on a demolition means railings, flashing, ductwork and pipe. What cannot go in is asbestos, clean fill, hazardous waste, radioactive material and liquids such as adhesives, paints, oils and tars, all excluded from the C and D definition by CGS section 22a-208x.
How do I keep the load inside payload on a demolition?
Load flat and load heavy first. Brick, block, plaster and concrete go on the floor of the box, spread across it rather than heaped at the door end, and timber and light material goes on top. Do not mix a chimney into a container of framing; put the masonry in a small box of its own where it can go out heavy without dragging a bigger container over the limit. Keep the box tarped, because plaster and rubble absorb water and a rained-on demolition load can gain a surprising amount of weight overnight. And ring for a swap at three quarters full rather than heaped, which is the point where a driver can still take it legally.
Where does the concrete slab go?
Into its own container, and preferably a 10 yard. Concrete, brick and block are the densest material on any demolition site and a small box loaded flat and low is the only sensible way to move them. Keep the slab clean of timber, soil and rubbish where you can, because clean masonry is easier to place than a mixed load. Note that clean fill is excluded from Connecticut's statutory definition of C and D waste, so soil and fill are a separate conversation rather than something to bury in the box. If the slab is coming out with the structure, tell us at the booking and we will bring both containers on the same run.
More services
Other things we haul
Residential Dumpster Rental
Driveway placement for full-basement, attic, porch and shed cleanouts and remodels.
Learn more →Commercial Dumpster Rental
Containers for businesses and buildings over six units, which the City does not collect from.
Learn more →Construction Dumpster Rental
Mixed C&D in one roll-off, the way CT DEEP recommends, with next-day swap-outs.
Learn more →Roofing Dumpster Rental
Weight-rated cans sized by squares and layers for asphalt shingle tear-offs.
Learn more →Roll-Off Dumpster Rental
10, 15, 20, 30 and 40 yard roll-offs across Hartford and the Capitol Region.
Learn more →Same-Day Dumpster Rental
Call before the cut-off and we can usually get a container to you this afternoon.
Learn more →Junk Removal Dumpsters
Clear a full basement, attic, porch or shed on your own schedule.
Learn more →Estate Cleanout Dumpsters
Discreet, patient container service for families clearing a lifelong home.
Learn more →Concrete & Heavy Debris
Dedicated heavy cans for concrete, brick, plaster and foundation spoil.
Learn more →Yard Waste & Brush Removal
Separate clean loads — Connecticut bans grass clippings from solid waste facilities.
Learn more →Where we deliver
Demolition Debris Removal across the Capitol Region and Greater Hartford
Same service, same flat rates, every town below. Pick yours for local placement and permit notes.
Talk to a real person
Need demolition debris removal in Hartford?
Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.
Serving Hartford, the Capitol Region and Greater Hartford · Mon–Fri 6:30am–5pm, Sat 7am–1pm